CA License #1119373Future Generation
Detached ADU on a Modesto residential lot in Stanislaus County, California.
Modesto ADU Builder

Backyard homes for the
Modesto grid.

A Sacramento design-build crew that already knows the La Loma bungalows, the Village I tracts up north, and why a College Area lot gets the panel opened before anyone talks square footage.

  • 30+ Years Experience
  • Licensed & Insured
  • 100+ 5-Star Reviews
ADU Estimator

Estimate Your ADU Project

ADU Type

Size — 400 sq ft

Estimated Cost

$134,000

Rental Income

$2,000/mo

Payback Period

6.3 yrs

Fast. Free. No obligation.

Trusted by homeowners across Sacramento & surrounding areas.

ADUs in Modesto — fast facts

CountyStanislaus County
RegionBay Area
ADU types we buildDetached, Attached, Garage Conversion, Custom
Contractor licenseCSLB #1119373
Free estimate(916) 677-9774

Last updated

Modesto lots, read straight

La Loma and Village I never quote alike

Modesto isn't one city. The College Area and La Loma blocks around Modesto Junior College are 1920s-1940s bungalows on deep lots with wiring nobody's touched since Truman; cross to Village I or the Pelandale tracts up north and it flips to newer subdivisions, flatter pads, and an HOA committee, while the downtown grid near Graceada Park and the south side toward the Tuolumne River bring lower ground and a flood fringe. So we don't quote off a stock sheet: our PM opens the panel, checks the side-gate access, and measures the rear setback off the real fence line, not the assessor map. You give up an afternoon; the alternative is a $9K change order after the slab is poured.

Finished interior of a Modesto-area ADU with kitchen and living space.
  • Free on-site walk before a dollar gets committed
  • Side-yard access and electrical panel checked during design, not mid-build
  • Plans drawn to your real Modesto setbacks, not a catalog footprint
The Modesto detail nobody warns you about

In Modesto your power is MID, not PG&E

Here's the one that catches out-of-town builders. Most of Modesto runs on the Modesto Irrigation District, MID, not PG&E: a publicly owned utility with its own queue for a service drop, meter set, or panel upgrade. Gas is still PG&E, so a backyard unit means two utilities on two schedules, and a builder who files everything with PG&E has bought a delay. We file the MID request in week one, when the structural set hits the counter. On the older College Area and downtown homes the panel is the homework: many carry an original 100-amp service, sometimes cloth-and-rubber wiring, that can't legally feed a second dwelling, so we open it on the first visit and price the upgrade up front.

Modesto ADU exterior with new siding and a separate service entrance.
  • MID electric service and meter set handled on their schedule, filed early
  • Gas coordinated separately with PG&E so neither utility stalls the job
  • Older-home panel upgrades priced up front, not sprung after framing
Permits, in plain English

The City of Modesto counter and its 60-day clock

Your ADU goes through the City of Modesto, not Stanislaus County, when your house is inside the city limits, with the Community and Economic Development Department running plan check on Tenth Street downtown. State law took discretionary review off the table, so once a clean set clears the city has to issue, and California puts a 60-day clock on it; no neighborhood hearing kills your unit over a sightline. The honest part: Modesto's counter is busy, a city of 220,000, and first comments can use most of that window. We answer with a full set drawn in-house that goes in clean, and the person who drew a sheet handles its correction. Signed contract to permit runs about 9-15 weeks here.

Garage conversion to ADU underway on a Modesto residential lot.
  • Permit pulled through the City of Modesto on Tenth Street downtown
  • Complete in-house plan set: site, structural, Title-24, MEP
  • Corrections answered by the person who drew the sheet
Real Modesto numbers

Modesto ADU pricing, panel to clay footing

Online figures of $200-$400 a square foot are about as useful as saying a used car costs $8K-$40K. In Modesto a 612 sq ft one-bed detached with mid-grade finishes runs roughly $238K-$298K all-in for 2025-2026 — above Sacramento because we're hauling a crew down Highway 99, below the true Bay because this is the Valley. A 968 sq ft two-bed lands near $372K-$465K; a garage conversion runs $150K-$235K. Rent makes the math work: a one-bed pulls $1,650-$2,150 a month, a two-bed $2,150-$2,750, fed by Altamont and ACE-train commuters priced out of the Tri-Valley plus Modesto Junior College and the medical campuses. Every prospect gets a fixed-price proposal after the free walk, financing if wanted; a change order only fires on a finish upgrade, never a missed panel, clay, or flood line.

Completed ADU interior in a Modesto backyard, Stanislaus County.
  • 612 sq ft detached one-bed: roughly $238K–$298K all-in (2025–2026)
  • Modesto one-bed ADU rents around $1,650–$2,150/mo
  • Fixed-price contract — itemized scope, financing available if you want it
Build Smart. Invest Wise.

Build Your ADU.
Your Investment,
Your Future.

From design to move-in, we handle everything. Transparent pricing, on-time delivery, and uncompromising quality.

Custom Designs

Tailored to you

Built to Last

Premium materials

Fast Turnaround

On-time delivery

Full-Service

From start to finish

30+

Years of Experience

120+

ADU Projects Completed

100+

Happy Homeowners

Completed ADU built by Future Generation in Sacramento

Built for Value.
Designed for Life.

Trusted by homeowners across Sacramento & surrounding areas.

ADU Estimator

Know Your Numbers Before You Commit

Get an instant estimate of construction cost, rental income, ROI, and timeline. No email required to see your number.

1. ADU TYPE

2. SIZE

3. FINISH LEVEL

Question 1 of 3

What type of ADU?

Choose how your unit connects to your property.

Rated Excellent
by Our Clients

5.0

Based on 120+ reviews

See what homeowners are saying about us

View Reviews
GoogleyelpBBBA+ Ratinghouzz

Your Live Estimate

Detached ADU800 sq ftStandard

Estimated Construction Cost

$189,000

≈ $236/sq ft · all-in, turnkey

Est. Rental Income$2,800/mo
Annual Income$33,600/yr
Build Timeline5–7 months
Payback Period6.3 yrs

15.8% annual ROI

Based on local rents & your selections

Estimate for planning only. Final pricing depends on site conditions, lot, and city fees. Get an exact quote from our team — free.

Hi there!

I'm Tim, your ADU specialist.

I'll help you build smart and maximize your investment.

Tim, ADU specialist at Future Generation

Our Recent ADU Projects

Real Projects. Real Results.

We design and build high-quality ADUs that increase property value and generate real income.

100+

ADUs Built

Local

Sacramento Experts

4.9/5

Average Rating

View All Projects
As Seen OnGoogleyelphouzzBBB
Tim, ADU specialist

“Every ADU we build is designed to add long-term value and open new possibilities for your property. Let's build something great together.”

— Tim, ADU Specialist

Custom Designs

Built to fit your property & needs

Turnkey Process

We handle permits, plans & everything

Built to Last

Quality craftsmanship that stands the test

Financing Made Simple

$0 Down Options. Build Now, Pay Over Time.

You shouldn't have to drain your savings to build wealth. We partner with trusted ADU lenders to find financing that fits — many homeowners build with little to nothing out of pocket.

Home Equity (HELOC)

Tap your existing equity at competitive rates — the most popular way to fund an ADU.

Renovation Loans

Finance the build against your home's projected after-completion value.

ADU-Specific Financing

Specialized lenders who underwrite based on the rental income your ADU will produce.

Cash-Out Refinance

Roll the project into a new mortgage and keep one simple monthly payment.

Estimate Your Monthly Payment

See what financing your ADU could look like — and how rental income can help cover it.

$180,000Loan amount

Credit Score

Very good · 700–739

Estimated Monthly Payment

$1,320/mo

At 7.99% APR over 30 years (illustrative)

  • Often offset by $2,000–$3,500/mo in rental income
  • No prepayment penalties with most partners
  • Pre-qualification with no impact to your credit

Illustrative only — not a loan offer. Actual rates and terms are set by third-party lenders based on your qualifications.

Frequently asked

Questions, answered

The most common things Sacramento homeowners ask before starting an ADU project.

  • The City of Modesto, in almost every case. Modesto is an incorporated city with its own Community and Economic Development Department, and your ADU's permit, plan check, and inspections all run through the city downtown on Tenth Street. Stanislaus County's building department only has authority over unincorporated land — the rural parcels and communities like Salida, Empire, or the county pockets out past the city limits. If your house sits on a Modesto street with city sewer, you're a city project. We confirm which jurisdiction governs your lot on the first visit so a set never lands on the wrong counter.
Special Offer · Get Up To$5,000 OFFYour New ADU Build!

Build Your ADU
for Less

Save up to $5,000 on your detached, attached, or garage-conversion ADU. Permits and design included.

(916) 677-9774
  • Licensed & Insured
  • 5-Star Rated
  • Local Sacramento Team
Tim, ADU specialist at Future Generation

Video Testimonials

What Our Clients Had to Say About Us

Watch real clients share their experiences working with our team.

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Granite Bay clients feedback on working with Future Generation Construction

Feedback from Debra Alqiza on working with Future Generation Construction

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Client Testimonials

What Our Clients Say

Real stories from real homeowners across the Sacramento area.

Future Generation Construction on Instagram
@futgenconstruction

Follow our latest projects

Follow on Instagram

Ready When You Are

Ready to Build Your ADU?

Get a free, no-obligation estimate and a clear plan — design, permits, and construction all under one roof.

Free, No-Obligation Estimate

Transparent pricing tailored to your project.

Design, Permits & Construction

We handle it all, start to finish.

Local & Trusted Experts

Built with care. Backed by experience.

Call Us Anytime(916) 677-9774We're here to help — free consultation
Paul, owner of Future Generation

We treat every home like it's our own — quality work, clear communication, and happy homeowners.

PaulOwner · Future Generation
Paul, Owner at Future Generation

Get Your Free Estimate

Hi, I'm Paul, Owner. I'll get back to you within 24 hours.

100% Secure

Your information is safe with us

Fast Response

We respond within 24 hours

No Obligation

Get expert advice with zero pressure

By submitting, you agree to be contacted about your project. We never share your information.

Carrie Z
I had two bathrooms completely remodeled, two windows replaced and some siding. Everything stayed on track as planned and I absolutely love the end product. The communication was great.
Carrie Z · Google Review
7 min read1,546 words8 sections

Building an ADU in Modesto: what a Sacramento contractor knows about the Stanislaus County grid

Modesto is the seat of Stanislaus County, the farm capital of the northern San Joaquin Valley, and it builds nothing like the tidy Sacramento suburbs an hour and a quarter north. Central neighborhoods run pre-war bungalows on deep lots; the north side runs newer tracts with HOAs; the south edge backs up against the Tuolumne and its flood mapping. Most of the city draws its power from a public utility, not PG&E, and a good share of the dirt is expansive clay. We're a Sacramento crew that takes the Modesto jobs worth the drive down 99. Here's the straight version.

01Section

How Modesto became an ADU market

Modesto was platted in 1870 when the Central Pacific laid track through the valley, and for a century it was a farm-supply town ringed by almonds, dairies, and Gallo's vineyards, with cheap, plentiful housing. That era is over. Rents climbed through the 2010s, the for-sale market priced out families who grew up here, and Bay Area overflow landed hard against the Altamont. The city sits on Highway 99 with the ACE train running commuters toward the Tri-Valley and BART, so people who work in the East Bay but can't afford to live there look down here, where a rental runs well under Pleasanton numbers.

The real shift came from the state legislature: California's ADU laws made the permit ministerial, so the City of Modesto has to approve a compliant set instead of routing it to a discretionary hearing where a neighbor could fight it over a fence-line view. That turned a Modesto ADU from a slow maybe into a predictable few-month path, and it's why the unused 600 square feet behind a valley ranch home now pencils as the best thing a homeowner can build.