CA License #1119373Future Generation
Aerial view of a completed detached ADU sitting in the backyard of a suburban home
Stockton · Detached ADU

A standalone backyard home
engineered for Delta ground.

Its own foundation, its own roof, its own front door — a detached ADU built for Stockton's high water table and permitted through the city, with the soil report done first.

  • 30+ Years Experience
  • Licensed & Insured
  • 100+ 5-Star Reviews
ADU Estimator

Estimate Your ADU Project

ADU Type

Size — 400 sq ft

Estimated Cost

$134,000

Rental Income

$2,000/mo

Payback Period

6.3 yrs

Fast. Free. No obligation.

Trusted by homeowners across Sacramento & surrounding areas.

Detached ADU in Stockton — fast facts

CityStockton
ADU typeDetached ADU
Contractor licenseCSLB #1119373
Free estimate(916) 677-9774

Last updated

What detached actually means

A real building, not a bump-out

Detached means the unit stands on its own. New foundation, new roof, four new walls, nothing shared with the house you already live in. That independence is the whole point — and it's the heaviest of the three ADU types, because you're putting a small house in the backyard from dirt up. In Stockton I usually frame these between 520 and 760 sq ft, sized by lot setbacks and what the family actually needs. The payoff is freedom. You set the front door, the windows, and the privacy line wherever they make sense, not where an old garage opening used to be. On a Delta lot that flexibility also lets us put the unit where the ground cooperates.

Detached ADU framed and roofed in a residential backyard during construction
  • Own foundation, own roof system — structurally separate from the main house
  • Place the entrance and windows wherever privacy and sun work best
  • Full ground-up build, so the schedule runs longer than a conversion
Permitting in Stockton

The city signs off, not the county

Stockton is its own incorporated city, so your detached ADU permit goes through the City of Stockton — not San Joaquin County, even though the county wraps around it. The city runs its own building counter, its own fee schedule, its own inspectors. That matters for timelines and for how they read state ADU law. If you're in the historic Magnolia District, expect tighter design scrutiny — those grand Victorians sit in a protected area and the city looks hard at anything visible from the street. Out in Brookside, Spanos Park, or Weston Ranch you're more likely dealing with an HOA review running parallel to the city. We submit on both tracks and chase the approvals so they don't stack end to end.

Contractor reviewing ADU permit plans on site in Stockton
  • Plans submitted to the City of Stockton building department
  • Design review in the historic Magnolia District for street-facing work
  • HOA review in master-planned areas like Brookside and Spanos Park
Siting on the lot

Where the unit lands changes everything

Placement is the first real decision, and in Stockton it's not only about setbacks. Rear and side property-line clearances fix the footprint, sure. But the Delta adds a second question: which corner of the yard has the better soil and the lower water table. I walk the lot before I draw, and on the west and south sides of town I'm thinking about where the peat is shallow and where the ground stays drier. Then there's access — the path framing, trusses, and concrete take from the street to the backyard. A four-foot side gate versus a six-foot one decides whether material comes in by hand. Orientation sets your light too; I aim the main windows for sun and away from a neighbor's upstairs.

Detached ADU sited in a backyard showing setback from property line
  • Rear and side setbacks fix the buildable footprint
  • Soil and water-table conditions can steer where on the lot it sits
  • Side-yard access width dictates how material reaches the backyard
Utilities and the foundation

Separate runs, engineered footing

A detached unit needs its own utility runs trenched from the house: water, sewer, and a PG&E electrical feed, usually landing in a sub-panel sized for a heat pump and a small kitchen. We trench, sleeve, and inspect before anything gets backfilled. The foundation is where Stockton earns its reputation. Near the Delta and the waterways the ground can be soft, organic peat with a high water table, and liquefaction zones are real here — so we start with a soil report, not a guess. Depending on what it says, a plain slab gets swapped for something engineered: stem walls, a thickened mat, or piers driven down to firmer bearing. It's more up front. It's the difference between a level floor and a sinking one.

Utility trenching and foundation prep for a detached ADU build
  • Dedicated water, sewer, and PG&E power trenched from the house
  • Soil report first, then a foundation matched to Delta conditions
  • Stem walls, a thickened mat, or piers where peat and water demand it
Build Smart. Invest Wise.

Build Your ADU.
Your Investment,
Your Future.

From design to move-in, we handle everything. Transparent pricing, on-time delivery, and uncompromising quality.

Custom Designs

Tailored to you

Built to Last

Premium materials

Fast Turnaround

On-time delivery

Full-Service

From start to finish

30+

Years of Experience

120+

ADU Projects Completed

100+

Happy Homeowners

Completed ADU built by Future Generation in Sacramento

Built for Value.
Designed for Life.

Trusted by homeowners across Sacramento & surrounding areas.

ADU Estimator

Know Your Numbers Before You Commit

Get an instant estimate of construction cost, rental income, ROI, and timeline. No email required to see your number.

1. ADU TYPE

2. SIZE

3. FINISH LEVEL

Question 1 of 3

What type of ADU?

Choose how your unit connects to your property.

Rated Excellent
by Our Clients

5.0

Based on 120+ reviews

See what homeowners are saying about us

View Reviews
GoogleyelpBBBA+ Ratinghouzz

Your Live Estimate

Detached ADU800 sq ftStandard

Estimated Construction Cost

$189,000

≈ $236/sq ft · all-in, turnkey

Est. Rental Income$2,800/mo
Annual Income$33,600/yr
Build Timeline5–7 months
Payback Period6.3 yrs

15.8% annual ROI

Based on local rents & your selections

Estimate for planning only. Final pricing depends on site conditions, lot, and city fees. Get an exact quote from our team — free.

Hi there!

I'm Tim, your ADU specialist.

I'll help you build smart and maximize your investment.

Tim, ADU specialist at Future Generation

Our Recent ADU Projects

Real Projects. Real Results.

We design and build high-quality ADUs that increase property value and generate real income.

100+

ADUs Built

Local

Sacramento Experts

4.9/5

Average Rating

View All Projects
As Seen OnGoogleyelphouzzBBB
Tim, ADU specialist

“Every ADU we build is designed to add long-term value and open new possibilities for your property. Let's build something great together.”

— Tim, ADU Specialist

Custom Designs

Built to fit your property & needs

Turnkey Process

We handle permits, plans & everything

Built to Last

Quality craftsmanship that stands the test

Financing Made Simple

$0 Down Options. Build Now, Pay Over Time.

You shouldn't have to drain your savings to build wealth. We partner with trusted ADU lenders to find financing that fits — many homeowners build with little to nothing out of pocket.

Home Equity (HELOC)

Tap your existing equity at competitive rates — the most popular way to fund an ADU.

Renovation Loans

Finance the build against your home's projected after-completion value.

ADU-Specific Financing

Specialized lenders who underwrite based on the rental income your ADU will produce.

Cash-Out Refinance

Roll the project into a new mortgage and keep one simple monthly payment.

Estimate Your Monthly Payment

See what financing your ADU could look like — and how rental income can help cover it.

$180,000Loan amount

Credit Score

Very good · 700–739

Estimated Monthly Payment

$1,320/mo

At 7.99% APR over 30 years (illustrative)

  • Often offset by $2,000–$3,500/mo in rental income
  • No prepayment penalties with most partners
  • Pre-qualification with no impact to your credit

Illustrative only — not a loan offer. Actual rates and terms are set by third-party lenders based on your qualifications.

Frequently asked

Questions, answered

The most common things Sacramento homeowners ask before starting an ADU project.

  • From the City of Stockton. Stockton is its own incorporated city in San Joaquin County, so it runs its own building and planning department — your detached ADU plans, fees, and inspections all go through the city, not the county. We've run submittals through their counter and know how they read state ADU law.
Special Offer · Get Up To$5,000 OFFYour New ADU Build!

Build Your ADU
for Less

Save up to $5,000 on your detached, attached, or garage-conversion ADU. Permits and design included.

(916) 677-9774
  • Licensed & Insured
  • 5-Star Rated
  • Local Sacramento Team
Tim, ADU specialist at Future Generation

Video Testimonials

What Our Clients Had to Say About Us

Watch real clients share their experiences working with our team.

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Granite Bay clients feedback on working with Future Generation Construction

Feedback from Debra Alqiza on working with Future Generation Construction

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Client Testimonials

What Our Clients Say

Real stories from real homeowners across the Sacramento area.

Future Generation Construction on Instagram
@futgenconstruction

Follow our latest projects

Follow on Instagram

Ready When You Are

Ready to Build Your ADU?

Get a free, no-obligation estimate and a clear plan — design, permits, and construction all under one roof.

Free, No-Obligation Estimate

Transparent pricing tailored to your project.

Design, Permits & Construction

We handle it all, start to finish.

Local & Trusted Experts

Built with care. Backed by experience.

Call Us Anytime(916) 677-9774We're here to help — free consultation
Paul, owner of Future Generation

We treat every home like it's our own — quality work, clear communication, and happy homeowners.

PaulOwner · Future Generation
Paul, Owner at Future Generation

Get Your Free Estimate

Hi, I'm Paul, Owner. I'll get back to you within 24 hours.

100% Secure

Your information is safe with us

Fast Response

We respond within 24 hours

No Obligation

Get expert advice with zero pressure

By submitting, you agree to be contacted about your project. We never share your information.

Carrie Z
I had two bathrooms completely remodeled, two windows replaced and some siding. Everything stayed on track as planned and I absolutely love the end product. The communication was great.
Carrie Z · Google Review
10 min read2,114 words8 sections

Building a Detached ADU in Stockton: How We Do It

A detached ADU is the most flexible thing you can put in a Stockton backyard, and it's also the most building. Standalone unit, own foundation, own roof, own utilities — a small independent home behind the one you already have. We're a Sacramento-based design-build crew, about 50 minutes north, and the thing that defines a build down here isn't the floor plan. It's the Delta ground under it. Here's the honest version of what that takes.

01Section

What "Detached" Really Means

California has three kinds of ADU and people mix them up constantly. There's the conversion, where you turn an existing garage or part of the house into a unit. There's the attached ADU, which shares a wall with the main home. And there's detached — a brand-new standalone building that touches nothing. New foundation, new roof system, four new exterior walls, its own everything. When somebody in Stockton tells me they want a backyard cottage, a guest house, or a self-contained place for a parent, they're describing detached even if they never use the word.

That independence is the reason to pick it. Because the unit shares no structure with your house, you decide everything from scratch — where the front door faces, which way the kitchen window looks, where the privacy lands. You're not boxed in by where a garage door used to be. On the modest lots that make up a lot of Stockton, that freedom is what lets a 600-square-foot unit feel private instead of cramped. And on a Delta lot it lets us put the building where the soil actually cooperates.