CA License #1119373Future Generation
Completed attached ADU joined to the main house on a Sacramento residential lot.
Sacramento · Attached ADU

One shared wall,
a whole separate home in Sacramento.

An attached ADU ties into your existing Sacramento house — its own entrance, kitchen and bath — while sharing a wall and utilities to keep the build leaner and the lot tighter.

  • 30+ Years Experience
  • Licensed & Insured
  • 100+ 5-Star Reviews
ADU Estimator

Estimate Your ADU Project

ADU Type

Size — 400 sq ft

Estimated Cost

$134,000

Rental Income

$2,000/mo

Payback Period

6.3 yrs

Fast. Free. No obligation.

Trusted by homeowners across Sacramento & surrounding areas.

Attached ADU in Sacramento — fast facts

CitySacramento
ADU typeAttached ADU
Contractor licenseCSLB #1119373
Free estimate(916) 677-9774

Last updated

Joined, not freestanding

What an attached ADU really is

An attached ADU shares exactly one wall with your existing house. That's the line that separates it from a detached cottage out back. Everything else makes it a full home: its own front door off the side or the back, a real kitchen, a full bath, a bedroom that nobody walks through to reach the laundry. On a College-Glen lot last year we hung a 480 sq ft one-bed off the east wall of a 1962 ranch, and the tenant never sets foot in the main house. The trade-off is structural — the new unit has to tie into your roofline, your foundation, and your wall assembly cleanly, which is its own kind of work. Done right, you can't tell where the old house stops.

Attached ADU addition framed against the existing Sacramento house wall.
  • Shares one wall; everything else is fully independent
  • Private entrance, full kitchen, full bath, real bedroom
  • Ties into the existing roof, foundation and wall line
The wall between two homes

The shared-wall fire assembly, explained

The wall you share is not an ordinary interior wall. Once two separate dwellings sit on either side of it, code wants a rated separation — typically a one-hour fire assembly running floor to roof, with the right gypsum layers, fireblocking, and often a sound-rated cavity so your tenant isn't listening to your TV. This is the part of an attached build that surprises people. We've opened up plenty of older Sacramento walls in Tahoe Park and Oak Park expecting balloon framing and 1940s wiring, and that existing wall almost always needs work to carry the rating. We detail the assembly on the plans, build it to the listed spec, and the inspector signs off on something that actually exists rather than a note nobody followed.

Shared fire-rated wall assembly between an attached ADU and the main Sacramento home.
  • One-hour rated separation between the two dwellings
  • Sound-rated cavity so neither side hears the other
  • Existing wall usually needs upgrading to hit the rating
City permits + SMUD

Permitting an attached ADU in Sacramento

Where you file depends on your parcel, not your mailing address. City-limit lots go through the City of Sacramento's Community Development Department; unincorporated stretches like parts of Arden-Arcade or Fruitridge route to the County. With an attached unit there's an extra wrinkle — plan check looks hard at how the addition connects to the existing structure, so the as-built condition of your house matters more than it does for a detached job. State law keeps the review ministerial, which is the leverage: a complete, code-compliant set has to be issued. We submit site plan, floor plan, elevations, the wall-tie structural details, Title-24, MEP, and SMUD coordination together. Clean attached submissions have been coming back around 4-6 weeks lately. A thin set buys you correction rounds.

Attached ADU addition on a Sacramento home pending City permit approval.
  • City vs County confirmed by your exact parcel first
  • Plan check scrutinizes the tie-in to the existing house
  • SMUD service and any panel work coordinated up front
What the number actually is

What an attached ADU costs in Sacramento

Here's a range, and then the honesty. A 500-ish sq ft one-bed attached unit with sensible mid-grade finishes generally lands around $215K to $275K all-in around here. Go bigger — a 750 sq ft two-bed with separate utilities throughout — and you're closer to $300K to $385K. Attached usually pencils a little under detached per square foot, because you're borrowing a wall and tapping into utilities that are already on the property instead of trenching a whole new run. The caveat I always give: that utility savings can evaporate. Cross 750 sq ft and the City may require a separate water meter, which adds real cost. We walk your lot, check your panel and your meter, then hand you a fixed price.

Interior finishes inside a completed attached ADU in Sacramento.
  • Roughly $215K-$385K depending on size and finish level
  • Usually a bit cheaper per sq ft than a detached unit
  • Past 750 sq ft a separate water meter can be required
Build Smart. Invest Wise.

Build Your ADU.
Your Investment,
Your Future.

From design to move-in, we handle everything. Transparent pricing, on-time delivery, and uncompromising quality.

Custom Designs

Tailored to you

Built to Last

Premium materials

Fast Turnaround

On-time delivery

Full-Service

From start to finish

30+

Years of Experience

120+

ADU Projects Completed

100+

Happy Homeowners

Completed ADU built by Future Generation in Sacramento

Built for Value.
Designed for Life.

Trusted by homeowners across Sacramento & surrounding areas.

ADU Estimator

Know Your Numbers Before You Commit

Get an instant estimate of construction cost, rental income, ROI, and timeline. No email required to see your number.

1. ADU TYPE

2. SIZE

3. FINISH LEVEL

Question 1 of 3

What type of ADU?

Choose how your unit connects to your property.

Rated Excellent
by Our Clients

5.0

Based on 120+ reviews

See what homeowners are saying about us

View Reviews
GoogleyelpBBBA+ Ratinghouzz

Your Live Estimate

Detached ADU800 sq ftStandard

Estimated Construction Cost

$189,000

≈ $236/sq ft · all-in, turnkey

Est. Rental Income$2,800/mo
Annual Income$33,600/yr
Build Timeline5–7 months
Payback Period6.3 yrs

15.8% annual ROI

Based on local rents & your selections

Estimate for planning only. Final pricing depends on site conditions, lot, and city fees. Get an exact quote from our team — free.

Hi there!

I'm Tim, your ADU specialist.

I'll help you build smart and maximize your investment.

Tim, ADU specialist at Future Generation

Our Recent ADU Projects

Real Projects. Real Results.

We design and build high-quality ADUs that increase property value and generate real income.

100+

ADUs Built

Local

Sacramento Experts

4.9/5

Average Rating

View All Projects
As Seen OnGoogleyelphouzzBBB
Tim, ADU specialist

“Every ADU we build is designed to add long-term value and open new possibilities for your property. Let's build something great together.”

— Tim, ADU Specialist

Custom Designs

Built to fit your property & needs

Turnkey Process

We handle permits, plans & everything

Built to Last

Quality craftsmanship that stands the test

Financing Made Simple

$0 Down Options. Build Now, Pay Over Time.

You shouldn't have to drain your savings to build wealth. We partner with trusted ADU lenders to find financing that fits — many homeowners build with little to nothing out of pocket.

Home Equity (HELOC)

Tap your existing equity at competitive rates — the most popular way to fund an ADU.

Renovation Loans

Finance the build against your home's projected after-completion value.

ADU-Specific Financing

Specialized lenders who underwrite based on the rental income your ADU will produce.

Cash-Out Refinance

Roll the project into a new mortgage and keep one simple monthly payment.

Estimate Your Monthly Payment

See what financing your ADU could look like — and how rental income can help cover it.

$180,000Loan amount

Credit Score

Very good · 700–739

Estimated Monthly Payment

$1,320/mo

At 7.99% APR over 30 years (illustrative)

  • Often offset by $2,000–$3,500/mo in rental income
  • No prepayment penalties with most partners
  • Pre-qualification with no impact to your credit

Illustrative only — not a loan offer. Actual rates and terms are set by third-party lenders based on your qualifications.

Frequently asked

Questions, answered

The most common things Sacramento homeowners ask before starting an ADU project.

  • An attached ADU shares one wall with your existing house and ties into its structure. A detached unit stands alone in the yard with its own foundation and roof, sharing nothing. Both are full independent homes with a private entrance, kitchen, and bath — the difference is purely whether the unit is physically joined to the main house. On a tight Sacramento lot, attached often wins because it doesn't need a separate building pad in the backyard.
Special Offer · Get Up To$5,000 OFFYour New ADU Build!

Build Your ADU
for Less

Save up to $5,000 on your detached, attached, or garage-conversion ADU. Permits and design included.

(916) 677-9774
  • Licensed & Insured
  • 5-Star Rated
  • Local Sacramento Team
Tim, ADU specialist at Future Generation

Video Testimonials

What Our Clients Had to Say About Us

Watch real clients share their experiences working with our team.

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Granite Bay clients feedback on working with Future Generation Construction

Feedback from Debra Alqiza on working with Future Generation Construction

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Client Testimonials

What Our Clients Say

Real stories from real homeowners across the Sacramento area.

Future Generation Construction on Instagram
@futgenconstruction

Follow our latest projects

Follow on Instagram

Ready When You Are

Ready to Build Your ADU?

Get a free, no-obligation estimate and a clear plan — design, permits, and construction all under one roof.

Free, No-Obligation Estimate

Transparent pricing tailored to your project.

Design, Permits & Construction

We handle it all, start to finish.

Local & Trusted Experts

Built with care. Backed by experience.

Call Us Anytime(916) 677-9774We're here to help — free consultation
Paul, owner of Future Generation

We treat every home like it's our own — quality work, clear communication, and happy homeowners.

PaulOwner · Future Generation
Paul, Owner at Future Generation

Get Your Free Estimate

Hi, I'm Paul, Owner. I'll get back to you within 24 hours.

100% Secure

Your information is safe with us

Fast Response

We respond within 24 hours

No Obligation

Get expert advice with zero pressure

By submitting, you agree to be contacted about your project. We never share your information.

Carrie Z
I had two bathrooms completely remodeled, two windows replaced and some siding. Everything stayed on track as planned and I absolutely love the end product. The communication was great.
Carrie Z · Google Review
9 min read1,922 words7 sections

Attached ADU design and construction in Sacramento

An attached ADU is the unit that shares one wall with your house and almost nothing else. Its own entrance, its own kitchen, its own bath — a complete second home that happens to be joined to your first. We design and build them across Sacramento, and most of this page is the stuff we wish every homeowner knew before the first phone call: how the shared wall works, what the City wants, and where the real money goes.

01Section

Attached or detached — which fits your lot

The first fork in any ADU conversation is attached versus detached, and on a Sacramento lot the answer usually comes down to geometry. An attached ADU grows off your house, sharing one wall. A detached unit stands alone in the backyard. People assume detached is the default, but a huge share of Sacramento's older lots are long and narrow, and a freestanding cottage needs clear space on every side to satisfy setbacks. Hang the unit off the house instead and you only have to clear the setback on the outer sides — often the difference between a project that pencils and one that doesn't.

There's a structural trade in both directions. Detached buys total independence: no shared wall, no tie-in to your roof, no worrying whether your 1950s footing can carry a new load. You pay for that with a second foundation and a second roof. Attached borrows your wall, your roofline, and frequently your utilities, which trims the budget — but it asks more of your existing house. If the wall it joins is in rough shape, or the foundation needs a transition, some of that savings goes right back into making the connection sound.