CA License #1119373Future Generation
Completed attached ADU joined to the main house on a Redwood City residential lot.
Redwood City · Attached ADU

One shared wall, a second
home on your Redwood City lot.

An attached ADU grows off your Redwood City house — private door, full kitchen, full bath — tied into the existing home and engineered for Peninsula faults.

  • 30+ Years Experience
  • Licensed & Insured
  • 100+ 5-Star Reviews
ADU Estimator

Estimate Your ADU Project

ADU Type

Size — 400 sq ft

Estimated Cost

$134,000

Rental Income

$2,000/mo

Payback Period

6.3 yrs

Fast. Free. No obligation.

Trusted by homeowners across Sacramento & surrounding areas.

Attached ADU in Redwood City — fast facts

CityRedwood City
ADU typeAttached ADU
Contractor licenseCSLB #1119373
Free estimate(916) 677-9774

Last updated

Joined, not freestanding

What an attached ADU really is

An attached ADU shares exactly one wall with your existing Redwood City house. That single wall is the whole difference between this and a detached cottage out back. Past it, the unit is a complete home — a private entrance off the side or rear, a real kitchen, a full bath, a bedroom a tenant reaches without ever crossing your living room. On the Peninsula, where lots run tight and land sells for a fortune, the attached unit often makes the most sense. The new build ties into your existing roofline, your foundation and your wall line. Done right, somebody walking past on a Mount Carmel block can't find the seam between the old house and the new home.

Attached ADU addition framed against the existing Redwood City house wall.
  • Shares one wall; everything past it is fully independent
  • Private entrance, full kitchen, full bath, real bedroom
  • Ties into the existing roof, foundation and wall line
The wall between two homes

The shared-wall fire and sound assembly

Your shared wall stops being an ordinary interior wall the second two separate dwellings sit on either side of it. Code wants a rated separation. Usually that's a one-hour fire assembly running floor to roof — the right gypsum layers, fireblocking at every penetration, and a sound-rated cavity so a tenant isn't living inside your television. This part surprises owners. Pull the finish off an older Friendly Acres bungalow and you'll often find wiring and sheathing that won't carry the rating as it sits. So the existing wall usually needs work too, not just the new side. We draw the assembly on the plans and build it to the listed spec, then the City inspector signs off on a wall that actually does its job.

Shared fire-rated wall assembly between an attached ADU and the main Redwood City home.
  • One-hour rated separation between the two dwellings
  • Sound-rated cavity so neither household hears the other
  • Existing wall often needs upgrading to hit the rating
City of Redwood City permits

Permitting an attached ADU here

Your permit files with the City of Redwood City — its own counter, its own rhythm. The Peninsula runs strict and slow, and the fees are high, so set your expectations to that going in. Attached units draw an extra look. Reviewers study how the addition connects to your existing house, so your home's as-built condition matters more than it would on a detached job. If there's an unpermitted bonus room nobody pulled paper on, it can surface during plan check, and we'd rather catch that before submittal than during. State law keeps ADU review ministerial, so a complete set has to be issued — but a thin submittal here buys correction cycles you feel in months, not weeks.

Attached ADU addition on a Redwood City home pending City permit approval.
  • City of Redwood City review — strict, slow, high fees
  • Plan check studies the tie-in to your existing house
  • A complete, code-compliant set keeps it ministerial
Shared utilities, real savings

Why the shared wall costs you less

The reason an attached ADU usually pencils cheaper than a detached one is right there in the name. You tap the foundation, the PG&E service and the water line already running to your house, instead of trenching the length of the lot to a freestanding cottage. That matters more on the Peninsula than almost anywhere — Bay Area detached units commonly run $400K to $750K and up, and the shared wall is how you knock a real chunk off that. One honest caveat: at 750 sq ft the City can require a separate water meter, and PG&E may want a panel upgrade before a second all-electric kitchen's load lands on your service. An attached unit also fits a tighter side yard than a detached build needs, which is the whole game on a narrow Centennial parcel.

Attached ADU utilities tied into the existing Redwood City home service.
  • Taps the existing foundation, PG&E service and water line
  • Cross the 750 sq ft line and a separate meter can apply
  • Fits a tighter side yard than a detached build needs
Build Smart. Invest Wise.

Build Your ADU.
Your Investment,
Your Future.

From design to move-in, we handle everything. Transparent pricing, on-time delivery, and uncompromising quality.

Custom Designs

Tailored to you

Built to Last

Premium materials

Fast Turnaround

On-time delivery

Full-Service

From start to finish

30+

Years of Experience

120+

ADU Projects Completed

100+

Happy Homeowners

Completed ADU built by Future Generation in Sacramento

Built for Value.
Designed for Life.

Trusted by homeowners across Sacramento & surrounding areas.

ADU Estimator

Know Your Numbers Before You Commit

Get an instant estimate of construction cost, rental income, ROI, and timeline. No email required to see your number.

1. ADU TYPE

2. SIZE

3. FINISH LEVEL

Question 1 of 3

What type of ADU?

Choose how your unit connects to your property.

Rated Excellent
by Our Clients

5.0

Based on 120+ reviews

See what homeowners are saying about us

View Reviews
GoogleyelpBBBA+ Ratinghouzz

Your Live Estimate

Detached ADU800 sq ftStandard

Estimated Construction Cost

$189,000

≈ $236/sq ft · all-in, turnkey

Est. Rental Income$2,800/mo
Annual Income$33,600/yr
Build Timeline5–7 months
Payback Period6.3 yrs

15.8% annual ROI

Based on local rents & your selections

Estimate for planning only. Final pricing depends on site conditions, lot, and city fees. Get an exact quote from our team — free.

Hi there!

I'm Tim, your ADU specialist.

I'll help you build smart and maximize your investment.

Tim, ADU specialist at Future Generation

Our Recent ADU Projects

Real Projects. Real Results.

We design and build high-quality ADUs that increase property value and generate real income.

100+

ADUs Built

Local

Sacramento Experts

4.9/5

Average Rating

View All Projects
As Seen OnGoogleyelphouzzBBB
Tim, ADU specialist

“Every ADU we build is designed to add long-term value and open new possibilities for your property. Let's build something great together.”

— Tim, ADU Specialist

Custom Designs

Built to fit your property & needs

Turnkey Process

We handle permits, plans & everything

Built to Last

Quality craftsmanship that stands the test

Financing Made Simple

$0 Down Options. Build Now, Pay Over Time.

You shouldn't have to drain your savings to build wealth. We partner with trusted ADU lenders to find financing that fits — many homeowners build with little to nothing out of pocket.

Home Equity (HELOC)

Tap your existing equity at competitive rates — the most popular way to fund an ADU.

Renovation Loans

Finance the build against your home's projected after-completion value.

ADU-Specific Financing

Specialized lenders who underwrite based on the rental income your ADU will produce.

Cash-Out Refinance

Roll the project into a new mortgage and keep one simple monthly payment.

Estimate Your Monthly Payment

See what financing your ADU could look like — and how rental income can help cover it.

$180,000Loan amount

Credit Score

Very good · 700–739

Estimated Monthly Payment

$1,320/mo

At 7.99% APR over 30 years (illustrative)

  • Often offset by $2,000–$3,500/mo in rental income
  • No prepayment penalties with most partners
  • Pre-qualification with no impact to your credit

Illustrative only — not a loan offer. Actual rates and terms are set by third-party lenders based on your qualifications.

Frequently asked

Questions, answered

The most common things Sacramento homeowners ask before starting an ADU project.

  • An attached ADU shares one wall with your existing house. A detached unit stands alone in the yard. That shared wall is the whole difference — it lets the new unit borrow your foundation, your PG&E service and your water line, which usually makes it cheaper than a freestanding cottage on the same Redwood City lot. In a market where detached units commonly run $400K to $750K and up, that gap isn't small. An attached unit also fits a narrower side yard, which matters on the tight flat-bungalow parcels in Centennial and Friendly Acres where you don't have open ground to spare on all four sides.
Special Offer · Get Up To$5,000 OFFYour New ADU Build!

Build Your ADU
for Less

Save up to $5,000 on your detached, attached, or garage-conversion ADU. Permits and design included.

(916) 677-9774
  • Licensed & Insured
  • 5-Star Rated
  • Local Sacramento Team
Tim, ADU specialist at Future Generation

Video Testimonials

What Our Clients Had to Say About Us

Watch real clients share their experiences working with our team.

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Granite Bay clients feedback on working with Future Generation Construction

Feedback from Debra Alqiza on working with Future Generation Construction

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Client Testimonials

What Our Clients Say

Real stories from real homeowners across the Sacramento area.

Future Generation Construction on Instagram
@futgenconstruction

Follow our latest projects

Follow on Instagram

Ready When You Are

Ready to Build Your ADU?

Get a free, no-obligation estimate and a clear plan — design, permits, and construction all under one roof.

Free, No-Obligation Estimate

Transparent pricing tailored to your project.

Design, Permits & Construction

We handle it all, start to finish.

Local & Trusted Experts

Built with care. Backed by experience.

Call Us Anytime(916) 677-9774We're here to help — free consultation
Paul, owner of Future Generation

We treat every home like it's our own — quality work, clear communication, and happy homeowners.

PaulOwner · Future Generation
Paul, Owner at Future Generation

Get Your Free Estimate

Hi, I'm Paul, Owner. I'll get back to you within 24 hours.

100% Secure

Your information is safe with us

Fast Response

We respond within 24 hours

No Obligation

Get expert advice with zero pressure

By submitting, you agree to be contacted about your project. We never share your information.

Carrie Z
I had two bathrooms completely remodeled, two windows replaced and some siding. Everything stayed on track as planned and I absolutely love the end product. The communication was great.
Carrie Z · Google Review
9 min read2,004 words8 sections

Building an Attached ADU in Redwood City, San Mateo County

An attached ADU in Redwood City borrows one wall from your existing house and turns the rest into a separate, legal home — its own entrance, kitchen and bath. We're a Sacramento design-build contractor, license #1119373, about two hours north. That distance is the first honest thing on this page: we extend down to Redwood City for owners who want our craftsmanship and value, or for projects big enough to earn the drive. What follows is how we think about attached units here, where the Peninsula's faults, terrain and slow permitting change the math, and where it gets harder than the brochure says.

01Section

What "attached" actually buys you

The word attached carries the whole concept. Your new unit shares precisely one wall with your existing Redwood City house and is otherwise a complete, independent home — a private door off the side or rear, a real kitchen with its own range and sink, a full bath, and a bedroom a tenant reaches without stepping into your space. That single shared wall is the only thing tethering the two homes together. Everything else stands on its own.

That one connection is why people pick attached over detached on the Peninsula. You're not setting a freestanding cottage at the back of a high-value lot and trenching utilities the length of the parcel to reach it. You grow off the house already standing, leaning on the foundation, panel and water line already there. On a Redwood City lot — tight, expensive, sometimes on a hillside grade — that sidesteps a fair amount of the site's difficulty before you've poured a thing.