CA License #1119373Future Generation
Custom-designed ADU sited on a sloped Placerville foothill lot in El Dorado County Gold Country.
Placerville · Custom ADU

A custom ADU drawn for one Placerville lot —
slope, granite, fire zone and all.

No catalog plan reads a Gold Country lot that falls down a foothill over solid granite. We draw a bespoke unit for your parcel, then build it through final.

  • 30+ Years Experience
  • Licensed & Insured
  • 100+ 5-Star Reviews
ADU Estimator

Estimate Your ADU Project

ADU Type

Size — 400 sq ft

Estimated Cost

$134,000

Rental Income

$2,000/mo

Payback Period

6.3 yrs

Fast. Free. No obligation.

Trusted by homeowners across Sacramento & surrounding areas.

Custom ADU in Placerville — fast facts

CityPlacerville
ADU typeCustom ADU
Contractor licenseCSLB #1119373
Free estimate(916) 677-9774

Last updated

Why custom in Placerville

When a stock plan can't read the lot

A catalog ADU plan assumes a flat rectangle with clean dirt under it. Placerville almost never gives you that. These are Sierra-foothill lots at around 1,900 feet — grade that rolls off toward a draw, decomposed granite a few feet down, mature oaks you're not cutting, and a fire-severity map most builders never open. Our designer starts from your survey and the real parcel: City of Placerville setbacks, the slope, the granite line, the defensible-space clearance the fire zone wants. Up off Cedar Ravine or out toward Apple Hill the lot falls hard from the road, and the spot that gives real separation sits downhill and well back. Custom shapes a plan around all of it instead of fighting it.

Custom ADU framed on a sloped Placerville foothill lot, sited around mature trees.
  • Drawn around the slope, the foothill view, mature oaks and granite
  • Designer works from your survey, not a fixed concrete pad
  • Fire-zone clearance and 7A read into the design from line one
The design phase

Design phase, site walk to permit

Custom gets won or lost in the drawings, so the hours go there. It opens with a site walk and a measure-up, and on a Placerville lot a survey never tells the whole story. I want to see where granite breaks the surface, how the grade moves off the foothill, where the PG&E service drops in, and whether you're on septic. Then concept sketches. You react, we revise — most clients run two or three rounds, a few push past five. Once the layout locks we draft construction documents: structural for the hillside foundation, Title-24, the Chapter 7A details, the PG&E load calc. The honest part: this front end runs six to ten weeks before anything hits the City of Placerville counter.

Custom ADU floor plan and elevations laid out during the Placerville design phase.
  • Site walk and measure-up before a single line gets drawn
  • Two to five revision rounds until the floor plan is right
  • Hillside foundation, 7A and PG&E load calc drawn in-house
Matching the main house

Echoing a Placerville home, old or new

A custom unit should look like it grew out of your house, not like it parachuted into the yard. Placerville makes that real work, because the housing stock swings hard. Down near Main Street you get the historic core — Old Hangtown, 1800s buildings under strict design review, where anything visible gets read line by line. Up the hill in the newer foothill subdivisions it's deeper eaves, board or stucco siding, simpler rooflines. We match roof pitch, pull eave depth, copy the trim, source siding that reads the same from the drive. Inside the historic district that match isn't optional — it's how a package clears review the first time instead of bouncing for corrections. Custom is the only path that gets there.

Custom ADU exterior detailed to match a Placerville home's roofline and siding.
  • Historic-district detailing near Main Street, drawn to clear review
  • Roof pitch, eave depth and siding pulled from your existing home
  • Simpler foothill lines for the newer subdivisions up the hill
Multi-gen + finishes

Multi-generational layouts done right

A good share of our Placerville custom work is families solving one exact problem — aging parents who want their own front door up here in Gold Country, or an adult kid who isn't leaving. That reshapes the plan. We draw zero-step entries, 36-inch doorways, curbless showers with grab-bar blocking already framed in, and a second primary suite so two generations each keep privacy. The detached ceiling is 1,200 sq ft, and custom clients with the room tend to push right against it — at that size you fit two real bedrooms, a full kitchen, a proper living room. Then finish level: quartz, real oak floors, a tiled shower instead of a fiberglass insert. Custom is where the premium package actually fits, designed in from day one.

Aerial of a larger custom ADU near the 1,200 sq ft ceiling on a Placerville foothill lot.
  • Zero-step entries, wider doorways, curbless showers, grab-bar blocking
  • Second primary suite so two generations share without crowding
  • Pushed toward the 1,200 sq ft ceiling with full premium finishes
Build Smart. Invest Wise.

Build Your ADU.
Your Investment,
Your Future.

From design to move-in, we handle everything. Transparent pricing, on-time delivery, and uncompromising quality.

Custom Designs

Tailored to you

Built to Last

Premium materials

Fast Turnaround

On-time delivery

Full-Service

From start to finish

30+

Years of Experience

120+

ADU Projects Completed

100+

Happy Homeowners

Completed ADU built by Future Generation in Sacramento

Built for Value.
Designed for Life.

Trusted by homeowners across Sacramento & surrounding areas.

ADU Estimator

Know Your Numbers Before You Commit

Get an instant estimate of construction cost, rental income, ROI, and timeline. No email required to see your number.

1. ADU TYPE

2. SIZE

3. FINISH LEVEL

Question 1 of 3

What type of ADU?

Choose how your unit connects to your property.

Rated Excellent
by Our Clients

5.0

Based on 120+ reviews

See what homeowners are saying about us

View Reviews
GoogleyelpBBBA+ Ratinghouzz

Your Live Estimate

Detached ADU800 sq ftStandard

Estimated Construction Cost

$189,000

≈ $236/sq ft · all-in, turnkey

Est. Rental Income$2,800/mo
Annual Income$33,600/yr
Build Timeline5–7 months
Payback Period6.3 yrs

15.8% annual ROI

Based on local rents & your selections

Estimate for planning only. Final pricing depends on site conditions, lot, and city fees. Get an exact quote from our team — free.

Hi there!

I'm Tim, your ADU specialist.

I'll help you build smart and maximize your investment.

Tim, ADU specialist at Future Generation

Our Recent ADU Projects

Real Projects. Real Results.

We design and build high-quality ADUs that increase property value and generate real income.

100+

ADUs Built

Local

Sacramento Experts

4.9/5

Average Rating

View All Projects
As Seen OnGoogleyelphouzzBBB
Tim, ADU specialist

“Every ADU we build is designed to add long-term value and open new possibilities for your property. Let's build something great together.”

— Tim, ADU Specialist

Custom Designs

Built to fit your property & needs

Turnkey Process

We handle permits, plans & everything

Built to Last

Quality craftsmanship that stands the test

Financing Made Simple

$0 Down Options. Build Now, Pay Over Time.

You shouldn't have to drain your savings to build wealth. We partner with trusted ADU lenders to find financing that fits — many homeowners build with little to nothing out of pocket.

Home Equity (HELOC)

Tap your existing equity at competitive rates — the most popular way to fund an ADU.

Renovation Loans

Finance the build against your home's projected after-completion value.

ADU-Specific Financing

Specialized lenders who underwrite based on the rental income your ADU will produce.

Cash-Out Refinance

Roll the project into a new mortgage and keep one simple monthly payment.

Estimate Your Monthly Payment

See what financing your ADU could look like — and how rental income can help cover it.

$180,000Loan amount

Credit Score

Very good · 700–739

Estimated Monthly Payment

$1,320/mo

At 7.99% APR over 30 years (illustrative)

  • Often offset by $2,000–$3,500/mo in rental income
  • No prepayment penalties with most partners
  • Pre-qualification with no impact to your credit

Illustrative only — not a loan offer. Actual rates and terms are set by third-party lenders based on your qualifications.

Frequently asked

Questions, answered

The most common things Sacramento homeowners ask before starting an ADU project.

  • More than a stock plan, and I won't pretend otherwise — custom is the priciest path. For a bespoke unit drawn for your lot, finished the way Placerville owners expect, a roughly 612 sq ft one-bedroom generally lands around $297K to $389K all-in for 2025-2026: design phase, engineering, permits, site work, the build, utilities and finishes. Push toward the 1,200 sq ft ceiling with two bedrooms and a premium package and you're closer to $445K to $625K. Three Placerville wildcards bend that — granite rock excavation, slope grading with possible retaining walls, and Chapter 7A fire-zone construction. If you're on septic, capacity for the second dwelling is a fourth. We walk the lot, shoot grades, probe for rock and check the fire map before writing a fixed price.
Special Offer · Get Up To$5,000 OFFYour New ADU Build!

Build Your ADU
for Less

Save up to $5,000 on your detached, attached, or garage-conversion ADU. Permits and design included.

(916) 677-9774
  • Licensed & Insured
  • 5-Star Rated
  • Local Sacramento Team
Tim, ADU specialist at Future Generation

Video Testimonials

What Our Clients Had to Say About Us

Watch real clients share their experiences working with our team.

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Granite Bay clients feedback on working with Future Generation Construction

Feedback from Debra Alqiza on working with Future Generation Construction

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Client Testimonials

What Our Clients Say

Real stories from real homeowners across the Sacramento area.

Future Generation Construction on Instagram
@futgenconstruction

Follow our latest projects

Follow on Instagram

Ready When You Are

Ready to Build Your ADU?

Get a free, no-obligation estimate and a clear plan — design, permits, and construction all under one roof.

Free, No-Obligation Estimate

Transparent pricing tailored to your project.

Design, Permits & Construction

We handle it all, start to finish.

Local & Trusted Experts

Built with care. Backed by experience.

Call Us Anytime(916) 677-9774We're here to help — free consultation
Paul, owner of Future Generation

We treat every home like it's our own — quality work, clear communication, and happy homeowners.

PaulOwner · Future Generation
Paul, Owner at Future Generation

Get Your Free Estimate

Hi, I'm Paul, Owner. I'll get back to you within 24 hours.

100% Secure

Your information is safe with us

Fast Response

We respond within 24 hours

No Obligation

Get expert advice with zero pressure

By submitting, you agree to be contacted about your project. We never share your information.

Carrie Z
I had two bathrooms completely remodeled, two windows replaced and some siding. Everything stayed on track as planned and I absolutely love the end product. The communication was great.
Carrie Z · Google Review
9 min read1,891 words8 sections

Building a Custom ADU in Placerville — A Straight-Talk Guide to Bespoke Design-Build in the El Dorado County Foothills

Custom is the version you reach for when a catalog plan can't read your lot or your family. A bespoke ADU drawn for one Placerville parcel — its slope, its granite, its fire-zone map, its setbacks — and one specific need, whether that's aging parents who want their own door or a layout that works around a pool and a stand of oaks. It's the priciest path and the slowest, and I'll say that plainly more than once. But on a Gold Country lot that falls off a 1,900-foot foothill over solid rock, it's often the only path that works. This guide covers doing it here specifically: the design phase, the City of Placerville permit route, the Old Hangtown historic district, the granite under your dirt, the Chapter 7A fire-zone rules most builders gloss over, multi-gen layouts, and the real 2025-2026 numbers.

01Section

What "custom" actually means here

Custom means the unit is drawn from scratch for your lot and your need — not picked from a binder of pre-engineered plans. No fixed footprint, no stock elevation. A designer starts with your survey, walks the property, and builds a plan around what's actually there. That's the line separating custom from a stock detached ADU, where you pick a model and drop it on a pad, and from a conversion that reuses a shell you own.

Custom exists because some lots and some families don't fit a template. A Placerville parcel that falls off a foothill, with granite three feet down and oaks you won't cut, can't take a rectangle drawn for flat valley dirt. Neither can a family that needs two generations under separate roofs with a wheelchair-friendly entry. The honest trade: custom is the most expensive ADU you can build and the slowest into the ground. Flat lot, generic need? A stock plan wins. But when the lot is odd or the need is specific, custom is usually the only thing that solves it — and that's a lot of Placerville parcels.